Tiecoat Sealer
Typical Test Data
T.B. Numbers refer to specific Technical Bulletins which are available on request.
MIX RATIO
n/a
SOLIDS CONTENT
38% by volume.
MAXIMUM COVERAGE RATE
0.2 l./m² (5 m²/l.). Tiecoat Sealer should be applied as a “flood coat.” Complete surface wetting is essential. Note: Rough, porous, absorbent, highly oxidised or undulating surfaces will inevitably increase the quantity of Tiecoat Sealer required.
DRY/CURE TIME
1 to 2 hours in dry conditions at 20° C followed by a hardening period. Tiecoat Sealer may exhibit a patchy appearance on drying due to differences in absorption across the substrate. High humidity may retard curing.
OVERCOAT TIME
Overnight, ideally within 2 days; 7 days maximum. If the primer is left longer than 7 days, apply a further coat of Tiecoat Sealer.
PACK SIZES
5 litres and 25 litres.
[ top ]